2008年一级建造师项目管理考试真题及答案

2020-06-29发布者:郝悦皓大小:77.50 KB 下载:0

videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "five water trea tment" "357" timetables "for three years to resolve outstanding issues, obv ious ly worked," victory of the year. The County 's departments at all levels mus t firmly establis h the "gua nghui is gold and silver" green development concept, convinced that Castle is not relaxed, always mainta ining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war, ever-higher levels of comprehens ive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this bas ic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County crea ted. Organization "look back" specia l inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accorda nce with the "one-stop strategy", improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincia l control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of "clear rivers" standa rds. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage treatment rate, running accuracy, compliance" requirement, speed up the town's support network cons truction, is focusing on nanotubes home "last meters" question. Domestic sewage trea tment in rura l areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the rea lization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewa ter trea tment facility up and running, role play, avoid the "Sun" problem. Third, pay specia l attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation pla n according to the priorities and the programme of work, in accordance with the "one river one policy" requires deta iled clea ning, dredging pla n, planning ahead of time cleaning out mud "way out", according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water mus t grab the source, wastewater is primarily the source of backward production capacity, increase the intens ity of 2008 年一级建造师项目管理考试真题及答案 一、单项选择题 1.( )是建设工程项目生产过程的总集成者—人力资源、物质资源和知识的集成,也是建设工程项目生产过程 的总组织者。 A.业主方 B.设计方 C.施工方 D.监理方 2.根据组织论的观点,( )组织结构的每一个工作部门的指令源都是唯一的。 A.职能 B.线性 C.矩阵 D.直线职能 3.施工企业项目经理在承担工程项目施工管理过程中,应履行的职责不包括( )。 A.贯彻有关法律、法规和政策 B.执行有关技术规范和标准 C.指挥工程项目建没的生产经营活动 D.实现安全,文明生产,努力提高经济效益 4.《中华人民共和国建筑法》提倡对建设工程实行总承包,禁止将建筑工程( )发包。 A.直接 B.平行 C.转移 D.肢解 5.项目采购模式中的( )在我国石油和石化等工业建设项目中得到了成功的应用。 A.设计联合体 B.施工联合体 C.设计施工总承包 D.设计采购施工总承包 6.( )在工程项目施工中处于中心地位,对工程项目施工进行全面管理。 A.业主 B.承包方 C.监理工程师 D.项目经理 7.在应用动态控制原理控制建设厂程项目目标时,调整项目管理班子人员属于( )措施。 A.组织 B.合同 C.经济 D.技术 8.国际上民用建筑项目工程总承包的招标多数采用( )的方式。 A.项目构造描述 B.项目功能描述 C.项目设计描述 D.项目价值描述 9.用比较法进行施工成本分析时,通常采用的比较形式不包括( )。 为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度 treatment of heavily polluting indus tries. According to municipal, and municipa l government deployment of seven big heavy pollution industry regulation "three years action pla ns", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped elimina ted in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standa rd of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity " environment access system, promoting indus try access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and recons truction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to esta blis h a long-term supervision mechanism, increase the intensity of specia l inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang suppor t river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control dra inage engineering construction, vigorous ly implementation "strong library" "s olid di" "spread row" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity ins ufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drink ing water safety projects, setting up water pricing reform and environmental protection mecha nism, guiding water depth. Further soil pollution and repa ir, streng then agricultura l non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation time is over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All loca lities and departments to the village and "no unauthorised" created videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "five water trea tment" "357" timetables "for three years to resolve outstanding issues, obv ious ly worked," victory of the year. The County 's departments at all levels mus t firmly establis h the "gua nghui is gold and silver" green development concept, convinced that Castle is not relaxed, always mainta ining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war, ever-higher levels of comprehens ive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this bas ic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County crea ted. Organization "look back" specia l inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accorda nce with the "one-stop strategy", improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincia l control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of "clear rivers" standa rds. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage treatment rate, running accuracy, compliance" requirement, speed up the town's support network cons truction, is focusing on nanotubes home "last meters" question. Domestic sewage trea tment in rura l areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the rea lization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewa ter trea tment facility up and running, role play, avoid the "Sun" problem. Third, pay specia l attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation pla n according to the priorities and the programme of work, in accordance with the "one river one policy" requires deta iled clea ning, dredging pla n, planning ahead of time cleaning out mud "way out", according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water mus t grab the source, wastewater is primarily the source of backward production capacity, increase the intens ity of A.将实际指标与目标指标对比 B.本期实际指标与上期实际指标对比 C.本期实际指标与拟完成指标对比 D.与本行业平均水平对比 10.施工企业项目经理应履行的职责是( )。 A.执行企业的各项管理制度 B.加强团队建设 C.调配进入工程项目的生产要素 D.进行合理的经济分配 11.工程监理人员认为工程( ),有权要求建筑施工企业改正。 A.施工不符合工程设计要求的 B.设计不符合建筑工程质量标准的 C.设计不符合合同约定的质量要求的 D.施工不符合工期预测的 12.事故防范措施和计划的落实与否,按建设工程项目的风险分类应属于( )。 A.经济与管理风险 B.技术风险 C.工程环境风险 D.组织风险 13.应用动态控制原理进行建设工程项目目标控制时,产生的纠偏可采取多种纠偏措施,下列纠偏措施中不属 于管理措施的是( )。 A.调整管理职能分工 B.采取限额设计的方法 C.采用价值工程的方法 D.强化合同管理 14.施工成本分析是施工成本管理的主要任务之一,下列关于施工成本分析的表述中正确的是( )。 A.施工成本分析的实质是在施工之前对成本进行估算 B.施工成本分析是指科学地预测成本水平及其发展趋势 C.施工成本分析是指预测成本控制的薄弱环节 D.施工成本分析应贯穿于施丁成本管理的全过程 15.按子项目组成编制的施工成本计划,首先要把项目总施工成本分解到( )和单位工程中去。 A.分部工程 B.分项工程 C.检验批 D.单项工程 16.当承包商在施工中遇到现场施工条件与招标文件中描述的现场条件有很大差异时,承包商( )。 A.只能提出工程单价变更 B.只能提出施工进度变更 C.不能提出工程变更 D.可提出工程单价变更和施工进度变更 17.工程变更发生后,( )应在商定或确定适宜费率或价格前,确定用于期中付款证书的临时费率或价格。 A.监理单位 B.工程师 C.承包人 D.发包人 18.在进行施工成本偏差分析时,最常用的一种方法是( )。 A.表格法 为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度 treatment of heavily polluting indus tries. According to municipal, and municipa l government deployment of seven big heavy pollution industry regulation "three years action pla ns", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped elimina ted in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standa rd of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity " environment access system, promoting indus try access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and recons truction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to esta blis h a long-term supervision mechanism, increase the intensity of specia l inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang suppor t river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control dra inage engineering construction, vigorous ly implementation "strong library" "s olid di" "spread row" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity ins ufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drink ing water safety projects, setting up water pricing reform and environmental protection mecha nism, guiding water depth. Further soil pollution and repa ir, streng then agricultura l non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation time is over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All loca lities and departments to the village and "no unauthorised" created videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "five water trea tment" "357" timetables "for three years to resolve outstanding issues, obv ious ly worked," victory of the year. The County 's departments at all levels mus t firmly establis h the "gua nghui is gold and silver" green development concept, convinced that Castle is not relaxed, always mainta ining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war, ever-higher levels of comprehens ive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this bas ic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County crea ted. Organization "look back" specia l inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accorda nce with the "one-stop strategy", improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincia l control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of "clear rivers" standa rds. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage treatment rate, running accuracy, compliance" requirement, speed up the town's support network cons truction, is focusing on nanotubes home "last meters" question. Domestic sewage trea tment in rura l areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the rea lization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewa ter trea tment facility up and running, role play, avoid the "Sun" problem. Third, pay specia l attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation pla n according to the priorities and the programme of work, in accordance with the "one river one policy" requires deta iled clea ning, dredging pla n, planning ahead of time cleaning out mud "way out", according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water mus t grab the source, wastewater is primarily the source of backwa rd production capacity, increase the intens ity of B.横道图法 C.曲线法 D.直方图法 19.通过( )的分析,可看出量、本、利的比例关系,从而为寻求降低成本的途径指明方向。 A.相关比率法 B.构成比率法 C.动态比率法 D.静态比率法 20.施工成本分析就是根据会计核算、( )和统计核算提供的资料,对施工成本的形成过程和影响成本升降的因 素进行分析。 A.单项核算 B.成本核算 C.利润核算 D.业务核算 21.( )进度控制的任务是控制整个项目实施阶段的工作进度。 A.设计方 B.施工方 C.监理方 D.业主方 22.当工程网络计划的计算丁期小于计划工期时,下列说法正确的是( )。 A.单代号网络计划中关键线路上相邻工作的时间间隔为零 B.双代号网络计划中关键节点的最早时间与最迟时间相等 C.双代号网络计划中所有关键工作的自由时差全部为零 D.单代号搭接网络汁划中关键线路上相邻工作的时距之和最大 23.下列说法中正确的是( )。 A.两端为关键节点的工作一定是关键工作 B.关键节点的最早时间与最迟时间有可能相等 C.关键工作两端的节点不一定是关键节点 D.由关键节点组成的线路一定是关键线路 24.在工程网络计划中,工作的最早开始时间应为其所有紧前工作( )。 A.最迟完成时间的最小值 B.最早完成时间的最大值 C.最早开始时间的最大值 D.最迟开始时间的最小值 25.在工程网络计划执行中,如果某项非关键工作实际进度拖延时间,超过其总时差,则( )。 A.工期会变化 B.工期不会变化 C.不会影响其后续工作 D.工期不会变化且不会影响其后续工作 26.建设工程项目进度臼标能否实现的决定性因素是( )。 A.组织 B.技术 C.施工 D.控制 27.在建设工程项目施工成本分析方法中,可用来分析各种因素成本的影响程度的方法是( )。 A.相关比率法 B.比重分析法 为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度 treatment of heavily polluting indus tries. According to municipal, and municipa l government deployment of seven big heavy pollution industry regulation "three years action pla ns", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped elimina ted in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standa rd of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity " environment access system, promoting indus try access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and recons truction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to esta blis h a long-term supervision mechanism, increase the intensity of specia l inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang suppor t river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control dra inage engineering construction, vigorous ly implementation "strong library" "s olid di" "spread row" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity ins ufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drink ing water safety projects, setting up water pricing reform and environmental protection mecha nism, guiding water depth. Further soil pollution and repa ir, streng then agricultura l non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation time is over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All loca lities and departments to the village and "no unauthorised" created videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "five water trea tment" "357" timetables "for three years to resolve outstanding issues, obv ious ly worked," victory of the year. The County 's departments at all levels mus t firmly establis h the "gua nghui is gold and silver" green development concept, convinced that Castle is not relaxed, always mainta ining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war, ever-higher levels of comprehens ive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this bas ic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County crea ted. Organization "look back" specia l inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accorda nce with the "one-stop strategy", improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincia l control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of "clear rivers" standa rds. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage treatment rate, running accuracy, compliance" requirement, speed up the town's support network cons truction, is focusing on nanotubes home "last meters" question. Domestic sewage trea tment in rura l areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the rea lization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewa ter trea tment facility up and running, role play, avoid the "Sun" problem. Third, pay specia l attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation pla n according to the priorities and the programme of work, in accordance with the "one river one policy" requires deta iled clea ning, dredging pla n, planning ahead of time cleaning out mud "way out", according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water mus t grab the source, wastewater is primarily the source of backward production capacity, increase the intens ity of C.连环置换法 D.动态比率法 28.业主方项目管埋的任务是建设工程项目的( )。 A.总进度目标控制 B.进度控制 C.质量控制 D.投资控制 29.三阶段控制原理的事前控制是进行周密的( )。 A.质量计划 B.资金策划 C.方案设计 D.环境调查 30.建设工程项目的施工质量计划编制,完成后,应经( )批准确认后执行。 A.企业技术负责人审核并报请工程监理单位或建设单位 B.项目经理中核并报请工程监理单位或建设单位 C.工程监理单位审核并报请建设单位 D.工程监理单位审核并报请工程质量监督机构 31.工程项目的施工环境不包括( )。 A.自然环境 B.社会环境 C.劳动组织环境 D.管理环境 32.施工质量计划编制完毕,应经( )审核批准,并按施工承包合同的约定提交建设工程监理批准确认后执行。 A.企业技术领导 B.项目技术负责人 C.施工项目经理 D.施工企业负责人 33.通过施工全过程的全面质量自控,保证交付满足施工合同及设计文件所规定的质量标准(含工程质量创优要 求)的建设工程产品,这是( )的质量控制目标。 A.建设单位 B.发包单位 C.监理单位 D.施工单位 34,大型建设工程项目总进度目标论证的核心工作是通过( )。 A.编制总进度纲要,论证总进度月标实现的可能性 B.分析工程发包组织方式,论证总进度日标分解的合理性 C.分析施工技术方面的资料,论证总进度目标的控制措施 D.分析施工组织资料,论证总进度目标实现的条件 35.ISO9000 族标准中,领导者的作用是( )。 A.进行过程管理 B.创造一个和谐的环境 C.加强团队建设 D.将本组织的宗旨、方向和内部环境统一起来 36.施工图设计文件审查是由( )对施工图进行的结构安全和强制性标准、规范执行情况等的独立审查。 A.设计主管部门 B.工程质量监督机构 C.依法认定的设计审查机构 为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度 treatment of heavily polluting indus tries. According to municipal, and municipa l government deployment of seven big heavy pollution industry regulation "three years action pla ns", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped elimina ted in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standa rd of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity " environment access system, promoting indus try access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and recons truction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to esta blis h a long-term supervision mechanism, increase the intensity of specia l inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang suppor t river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control dra inage engineering construction, vigorous ly implementation "strong library" "s olid di" "spread row" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity ins ufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drink ing water safety projects, setting up water pricing reform and environmental protection mecha nism, guiding water depth. Further soil pollution and repa ir, streng then agricultura l non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation time is over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All loca lities and departments to the village and "no unauthorised" created videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "five water trea tment" "357" timetables "for three years to resolve outstanding issues, obv ious ly worked," victory of the year. The County 's departments at all levels mus t firmly establis h the "gua nghui is gold and silver" green development concept, convinced that Castle is not relaxed, always mainta ining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war, ever-higher levels of comprehens ive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this bas ic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County crea ted. Organization "look back" specia l inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accorda nce with the "one-stop strategy", improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincia l control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of "clear rivers" standa rds. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage treatment rate, running accuracy, compliance" requirement, speed up the town's support network cons truction, is focusing on nanotubes home "last meters" question. Domestic sewage trea tment in rura l areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the rea lization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewa ter trea tment facility up and running, role play, avoid the "Sun" problem. Third, pay specia l attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation pla n according to the priorities and the programme of work, in accordance with the "one river one policy" requires deta iled clea ning, dredging pla n, planning ahead of time cleaning out mud "way out", according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water mus t grab the source, wastewater is primarily the source of backwa rd production capacity, increase the intens ity of D.监理单位 37.( )使得每项工程都要根据实际情况制定健康安全与环境管理计划。 A.建筑产品的多样性和生产的单件性 B.建筑产品的连续性和生产韵固定性 C.建筑产品的社会性和生产的时代性 D.建筑产品的现代性和生产的社会性 38.某些人忽视产品生产者的劳动条件和环境的改善,甚至以牺牲劳动者的职业健康安全和破坏人类赖以生存 的自然环境为代价,其原因主要是( )。 A.追求低成本、高利润 B.物质文明发展的要求 C.为生活所迫 D.自然灾害频发 39.( )是最基本的安全管理制度,是所有安全生产管理制度的核心。 A.安全生产教育制度 B.安全生产责任制 C.安全检查制度 D.安全监察制度 40.安全检查的重点是查违章指挥和( ) A.查管理 B.查整改 C.查事故处理 D.查违章作业 41.按照我国《企业伤亡事故分类标准》(GB6441—186)规定,职业伤害事故分为( )类。 A.16 B.18 C.20 D.22 42.职业健康安全管理体系与环境管理体系中定义为“具有自身职能和行政管理的公司,集团公司、商行、企事 业单位、政府机构或社团,或是上述单位的部分结合体,无论其是否法人团体,公营或私营”的是( )。 A.集合 B.团体 C.组织 D.机构 43.在工程施工中,要特别注意噪声不得超过国家标准的限值,对于打桩工作,夜间( )。 A.噪声限值为 45dB B.噪声限值为 50dB C.噪声限值为 55dB D.禁止施工 44.为了保证环境管理体系的有效实施,承担组织对环境责任的应是( )。 A.最高管理层 B.中层领导 C.具体负责建立体系的主要骨干人员 D.组织的所有部门 45.强化环境管理体系的过程,目的是根据组织的环境方针,实现对整体环境表现(行为)的改进是指( )。 A.持续改进 B.强化改进 C.过程改进 为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度 treatment of heavily polluting indus tries. According to municipal, and municipa l government deployment of seven big heavy pollution industry regulation "three years action pla ns", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped elimina ted in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standa rd of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity " environment access system, promoting indus try access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and recons truction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to esta blis h a long-term supervision mechanism, increase the intensity of specia l inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang suppor t river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control dra inage engineering construction, vigorous ly implementation "strong library" "s olid di" "spread row" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity ins ufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drink ing water safety projects, setting up water pricing reform and environmental protection mecha nism, guiding water depth. Further soil pollution and repa ir, streng then agricultura l non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation time is over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All loca lities and departments to the village and "no unauthorised" created
温馨提示:当前文档最多只能预览 6 页,此文档共12 页,请下载原文档以浏览全部内容。如果当前文档预览出现乱码或未能正常浏览,请先下载原文档进行浏览。
发表评论(共0条评论)
请自觉遵守互联网相关政策法规,评论内容只代表网友观点,发表审核后显示!

下载需知:

1 该文档不包含其他附件(如表格、图纸),本站只保证下载后内容跟在线阅读一样,不确保内容完整性,请务必认真阅读

2 除PDF格式下载后需转换成word才能编辑,其他下载后均可以随意编辑修改

3 有的标题标有”最新”、多篇,实质内容并不相符,下载内容以在线阅读为准,请认真阅读全文再下载

4 该文档为会员上传,版权归上传者负责解释,如若侵犯你的隐私或权利,请联系客服投诉

返回顶部